<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>DSD Group</title>
	<atom:link href="http://www.dsdconstruction.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.dsdconstruction.com</link>
	<description>The One Stop Shop For All Your Construction Needs</description>
	<lastBuildDate>Mon, 14 May 2012 14:02:10 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Tarmac Surfacing &#8211; West Lakes Academy</title>
		<link>http://www.dsdconstruction.com/tarmac-surfacing-west-lakes-academy/</link>
		<comments>http://www.dsdconstruction.com/tarmac-surfacing-west-lakes-academy/#comments</comments>
		<pubDate>Mon, 14 May 2012 14:02:10 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1061</guid>
		<description><![CDATA[West Lakes Academy, Egremont for KIER Infrastructure and Overseas Ltd. Contract period: September 2011 – December 2012 Contract Value: circa £300,000 Scope of Works: To carry out the tarmac surfacing work around the new school in the formation of new &#8230; <a href="http://www.dsdconstruction.com/tarmac-surfacing-west-lakes-academy/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/west-lakes-lrg.jpg" rel="lightbox[1061]" title="west-lakes-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/west-lakes-sml.jpg" alt="Tarmac Surfacing - West Lakes Academy" title="west-lakes-sml" width="280" height="210" class="alignleft size-full wp-image-1066" /></a><br />
<h2 id="projectHeading">West Lakes Academy, Egremont for KIER Infrastructure and Overseas Ltd.</h2>
<p><strong>Contract period:</strong> September 2011 – December 2012<br />
<strong>Contract Value:</strong> circa £300,000<br />
<strong>Scope of Works:</strong> To carry out the tarmac surfacing work around the new school in the formation of new playground areas, coach and car parking, access roads and a TARMAC MASTERTINT Buff coloured surface course as part of the featured entrance scheme. DSD are accredited, approved installers of Mastertint which is a TARMAC special product.<br />
<strong>Work included:</strong> ironwork adjustments and road markings.<br />
Work is progressing well and the first stage handover to the school was achieved recently. We continue to monitor costs with the main contractor and the work is aiming to be completed on time and within budget within a deadline programme period.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/tarmac-surfacing-west-lakes-academy/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Tarmac Surfacing &#8211; Richard Rose Morton Academy</title>
		<link>http://www.dsdconstruction.com/tarmac-surfacing-richard-rose-morton-academ/</link>
		<comments>http://www.dsdconstruction.com/tarmac-surfacing-richard-rose-morton-academ/#comments</comments>
		<pubDate>Mon, 14 May 2012 13:53:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1052</guid>
		<description><![CDATA[Richard Rose Morton Academy, Carlisle for KIER Infrastructure and Overseas Ltd. Contract period: May 2011 to April 2012 Contract Value: £376,000 Scope of Works: To carry out the tarmac surfacing work around the new school in the formation of new &#8230; <a href="http://www.dsdconstruction.com/tarmac-surfacing-richard-rose-morton-academ/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/academy-1-lrg.jpg" rel="lightbox[1052]" title="academy-1-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/academy-1-sml.jpg" alt="Tarmac Surfacing - Richard Rose Morton Academy" title="academy-1-sml" width="280" height="210" class="alignleft size-full wp-image-1055" /></a><br />
<h2 id="projectHeading">Richard Rose Morton Academy, Carlisle for KIER Infrastructure and Overseas Ltd.</h2>
<p><strong>Contract period:</strong> May 2011 to April 2012<br />
<strong>Contract Value:</strong> £376,000<br />
<strong>Scope of Works:</strong> To carry out the tarmac surfacing work around the new school in the formation of new footways, access roads and a porous car park as part of a SUDS scheme.<br />
<strong>Work included:</strong> Ironwork adjustments and road markings.<br />
Work was completed to budget within a tight programme period with restrictive site working hours which required multiple interfacing and co-ordination with external utility and service supplier companies and the main contractor working within the main school site.</p>
<p><span id="more-1052"></span><br />
<a href="http://www.dsdconstruction.com/wp-content/uploads/academy-2-lrg.jpg" rel="lightbox[1052]" title="academy-2-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/academy-2-sml.jpg" alt="Tarmac Surfacing - Richard Rose Morton Academy" title="academy-2-sml" width="280" height="210" class="aligncenter size-full wp-image-1058" /></a></p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/tarmac-surfacing-richard-rose-morton-academ/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Cumbria County Council 278 Works &#8211; A595</title>
		<link>http://www.dsdconstruction.com/a595-cumbria-county-council-road-works/</link>
		<comments>http://www.dsdconstruction.com/a595-cumbria-county-council-road-works/#comments</comments>
		<pubDate>Mon, 14 May 2012 13:47:32 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1049</guid>
		<description><![CDATA[Cumbria County Council 278 Works at the new entrance off the A595 to the Richard Rose Morton Academy, Carlisle for Amey Infrastructure. Contract period: August 2011 Contract Value: £43,000 Scope of Works: To carry out the formation of a new &#8230; <a href="http://www.dsdconstruction.com/a595-cumbria-county-council-road-works/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/cumbria-highways.jpg" rel="lightbox[1049]" title="cumbria-highways"><img src="http://www.dsdconstruction.com/wp-content/uploads/cumbria-highways.jpg" alt="" title="cumbria-highways" width="190" height="138" class="alignleft size-full wp-image-909" /></a><br />
<h2 id="projectHeading">Cumbria County Council 278 Works at the new entrance off the A595 to the Richard Rose Morton Academy, Carlisle for Amey Infrastructure.</h2>
<p><strong>Contract period:</strong> August 2011<br />
<strong>Contract Value:</strong> £43,000<br />
<strong>Scope of Works:</strong> To carry out the formation of a new entrance by re-arranging the existing entrance.<br />
<strong>Work included:</strong> Traffic safety and management control, site clearance, cold milling, ironwork adjustments, drainage, concrete protection to existing ducted services, earthworks, imported material fill and compaction, new tarmac surfacing, kerbing, footway formation, signage, road markings, street lighting, topsoiling and seeding.<br />
Work was completed to budget within a tight programme period with restrictive site working hours which required multiple interfacing and co-ordination with external utility and service supplier companies and the main contractor working within the main school site.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/a595-cumbria-county-council-road-works/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Access Road and Car Park &#8211; Dobbies Garden Centre</title>
		<link>http://www.dsdconstruction.com/road-car-parkdobbies-garden-centre/</link>
		<comments>http://www.dsdconstruction.com/road-car-parkdobbies-garden-centre/#comments</comments>
		<pubDate>Mon, 14 May 2012 13:40:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1042</guid>
		<description><![CDATA[A595/U1134 278 Works and Access Road/Car Parking at Dobbies Garden Centre, Orton Grange near Carlisle for Adonis Construction Ltd. Contract period: April to August 2011 Contract Value: £408,000 Scope of Works: To carry out the cold milling and profile planning &#8230; <a href="http://www.dsdconstruction.com/road-car-parkdobbies-garden-centre/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/dobbies-1-lrg.jpg" rel="lightbox[1042]" title="dobbies-1-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/dobbies-1-sml.jpg" alt="Access Road and Car Park at Dobbies" title="dobbies-1-sml" width="280" height="210" class="alignleft size-full wp-image-1044" /></a><br />
<h2 id="projectHeading">A595/U1134 278 Works and Access Road/Car Parking at Dobbies Garden Centre, Orton Grange near Carlisle for Adonis Construction Ltd.</h2>
<p><strong>Contract period:</strong> April to August 2011<br />
<strong>Contract Value:</strong> £408,000<br />
<strong>Scope of Works:</strong> To carry out the cold milling and profile planning of the existing roads in the formation of a new roundabout and access road off the A595 to the new car park access along with the supply and laying of the new surfacing on the 278 work section to Dobbies Garden Centre Car Park and entrance road along with associated footways and splitter islands. Additional localised work involved the upgrading of several existing home driveways and local repairs on the existing U1134.<br />
Work was completed to budget within a tight programme period with restrictive site working hours. It was also interfaced and co-ordinated with external utility and service supplier companies, the bulk excavation and earthworks contractor, traffic management and road marking gangs.</p>
<p><span id="more-1042"></span><br />
<a href="http://www.dsdconstruction.com/wp-content/uploads/dobbies-2-lrg.jpg" rel="lightbox[1042]" title="dobbies-2-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/dobbies-2-sml.jpg" alt="Access Road and Car Park at Dobbies" title="dobbies-2-sml" width="280" height="210" class="aligncenter size-full wp-image-1046" /></a></p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/road-car-parkdobbies-garden-centre/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sainsburys Superstore, Kelso &#8211; Surfacing Works</title>
		<link>http://www.dsdconstruction.com/sainsburys-superstore-kelso-surfacing-works/</link>
		<comments>http://www.dsdconstruction.com/sainsburys-superstore-kelso-surfacing-works/#comments</comments>
		<pubDate>Mon, 14 May 2012 13:30:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1033</guid>
		<description><![CDATA[New Sainsburys Superstore at Kelso for Careys Plc. With main contractor KIER Infrastructure and Overseas Ltd. Contract period: Nov 2010 to August 2011 Contract Value: £432,000 Scope of Works: To carry out the surfacing work to a new industrial estate &#8230; <a href="http://www.dsdconstruction.com/sainsburys-superstore-kelso-surfacing-works/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/kelso-surfacing-1-lrg.jpg" rel="lightbox[1033]" title="kelso-surfacing-1-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/kelso-surfacing-1-sml.jpg" alt="Kelso Surfacing Works" title="kelso-surfacing-1-sml" width="280" height="209" class="alignleft size-full wp-image-1035" /></a><br />
<h2 id="projectHeading">New Sainsburys Superstore at Kelso for Careys Plc. With main contractor KIER Infrastructure and Overseas Ltd.</h2>
<p><strong>Contract period:</strong> Nov 2010 to August 2011<br />
<strong>Contract Value:</strong> £432,000<br />
<strong>Scope of Works:</strong> To carry out the surfacing work to a new industrial estate (below) adjacent to the new store site with the new HRA access road and car park with associated footways and HGV access points around the store itself.</p>
<p><span id="more-1033"></span><br />
<a href="http://www.dsdconstruction.com/wp-content/uploads/kelso-surfacing-2-lrg.jpg" rel="lightbox[1033]" title="kelso-surfacing-2-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/kelso-surfacing-2-sml.jpg" alt="Kelso Surfacing Works" title="kelso-surfacing-2-sml" width="280" height="210" class="aligncenter size-full wp-image-1037" /></a></p>
<p>Both contracts were completed on time and to budget within tight programme periods. The initial industrial estate scheme was finished after a delay of 3 months due to the severe winter weather of 2010.  Due to the complex interfacing required by KIER, the co-ordination with Lothian and Borders Council, other sub-contractors and service suppliers meant a heavy commitment from all concerned. This was essential in completing the works on time for the store opening in time for Xmas 2012.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/sainsburys-superstore-kelso-surfacing-works/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Re-construction of Brunthill Road</title>
		<link>http://www.dsdconstruction.com/re-construction-brunthill-road/</link>
		<comments>http://www.dsdconstruction.com/re-construction-brunthill-road/#comments</comments>
		<pubDate>Fri, 11 May 2012 16:24:55 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1027</guid>
		<description><![CDATA[Cumbria County Council Carlisle Northern Development Route CNDR Section – The re-construction of Brunthill Road, Kingstown, Carlisle with Birse Civils Ltd. Contract period: April to June 2010 Contract Value: £225,000 Scope of Works: To carry out the re-construction of Brunthill &#8230; <a href="http://www.dsdconstruction.com/re-construction-brunthill-road/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/brunthill-road-lrg.jpg" rel="lightbox[1027]" title="brunthill-road-sml"><img src="http://www.dsdconstruction.com/wp-content/uploads/brunthill-road-sml.jpg" alt="Re-construction of Brunthill Road" title="brunthill-road-sml" width="280" height="210" class="alignleft size-full wp-image-1029" /></a><br />
<h2 id="projectHeading">Cumbria County Council Carlisle Northern Development Route CNDR Section – The re-construction of Brunthill Road, Kingstown, Carlisle with Birse Civils Ltd.</h2>
<p><strong>Contract period:</strong> April to June 2010<br />
<strong>Contract Value:</strong> £225,000<br />
<strong>Scope of Works:</strong> To carry out the re-construction of Brunthill Road in conjunction with the main Carlisle Northern Development Route works.<br />
Work included: Traffic safety and management control, site clearance, cold milling, new ironwork and adjustments to existing, drainage, concrete protection to existing ducted services, excavation and earthworks, imported material fill and compaction, new thin course tarmac surfacing, kerbing, footway formation, tactile paving, signage, road markings, street lighting, topsoiling and seeding.<br />
Work was completed to budget and within programme period with a live site with restrictive site working hours which required multiple interfacing and co-ordination with external utility and service supplier companies whilst working with the main contractor on the main scheme.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/re-construction-brunthill-road/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Surface Works &#8211; A595/B5435 Iron Bridge Junction</title>
		<link>http://www.dsdconstruction.com/a595-b5435-surface-works/</link>
		<comments>http://www.dsdconstruction.com/a595-b5435-surface-works/#comments</comments>
		<pubDate>Fri, 11 May 2012 16:17:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1022</guid>
		<description><![CDATA[MAC Area 13 Phases 1 &#038; 2 Improvement Works on the A595/B5435 Iron Bridge Junction near Egremont, Cumbria for Cumbria County Council with Amey Mouchel. Contract period: Ph 1 &#8211; February to April 2009 and Ph 2 – January to &#8230; <a href="http://www.dsdconstruction.com/a595-b5435-surface-works/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/a595-b5435-lrg.jpg" rel="lightbox[1022]" title="A595/B5435"><img src="http://www.dsdconstruction.com/wp-content/uploads/a595-b5435-sml.jpg" alt="A595/B5435 Surface Works" title="A595/B5435" width="280" height="210" class="alignleft size-full wp-image-1024" /></a><br />
<h2 id="projectHeading">MAC Area 13 Phases 1 &#038; 2 Improvement Works on the A595/B5435 Iron Bridge Junction near Egremont, Cumbria for Cumbria County Council with Amey Mouchel.</h2>
<p><strong>Contract period:</strong> Ph 1 &#8211; February to April 2009 and Ph 2 – January to March 2010<br />
<strong>Contract Value:</strong> £736,000<br />
<strong>Scope of Works:</strong> As Main Contractor DSD carried out the upgrading and improvement of the existing A595 road with the introduction of a new right hand turn lane.<br />
Works included: Site demolition, down-taking and clearance, bulk excavation &#038; earthwork, kerbing, formation of new reinforced concrete roads and accesses, cycleway access tracks, new flood prevention drainage, ironwork, stock-proof fencing, new thin surface course system surfacing, signage to footways and carriageway and interfacing with other trades and utility companies.<br />
Work completed to main contractor’s programmes and budgets.<br />
Traffic management by AmeyMouchel.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/a595-b5435-surface-works/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Caravan Bases &#8211; Scone Palace</title>
		<link>http://www.dsdconstruction.com/caravan-bases-scone-palace/</link>
		<comments>http://www.dsdconstruction.com/caravan-bases-scone-palace/#comments</comments>
		<pubDate>Fri, 11 May 2012 16:11:10 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=1002</guid>
		<description><![CDATA[Scone Palace C&#038;CC Site near Perth in Scotland. Contract period: December 2008 to March 2009 Contract Value: £486,000 Scope of Works: The formation of new touring and static bases along new access roads &#038; storage areas. The installation of the &#8230; <a href="http://www.dsdconstruction.com/caravan-bases-scone-palace/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/scone-place-1-lrg.jpg" rel="lightbox[1002]" title="Scone Place 1"><img src="http://www.dsdconstruction.com/wp-content/uploads/scone-place-1-sml.jpg" alt="Scone Palace C&amp;CC Site" title="Scone Place 1" width="280" height="210" class="alignleft size-full wp-image-1004" /></a><br />
<h2 id="projectHeading">Scone Palace C&#038;CC Site near Perth in Scotland.</h2>
<p><strong>Contract period:</strong> December 2008 to March 2009<br />
<strong>Contract Value:</strong> £486,000<br />
<strong>Scope of Works:</strong> The formation of new touring and static bases along new access roads &#038; storage areas.<br />
The installation of the new foul and surface water drainage scheme with pumping station and associated land drainage scheme.<br />
New electricity, gas, BT, TV, &#038; water services installation with local service points.</p>
<p><span id="more-1002"></span><br />

<a href='http://www.dsdconstruction.com/caravan-bases-scone-palace/scone-place-2-lrg/' title='scone-place-2-lrg'><img width="150" height="150" src="http://www.dsdconstruction.com/wp-content/uploads/scone-place-2-lrg-150x150.jpg" class="attachment-thumbnail" alt="scone-place-2-lrg" title="scone-place-2-lrg" /></a>
<a href='http://www.dsdconstruction.com/caravan-bases-scone-palace/scone-place-3-lrg/' title='scone-place-3-lrg'><img width="150" height="150" src="http://www.dsdconstruction.com/wp-content/uploads/scone-place-3-lrg-150x150.jpg" class="attachment-thumbnail" alt="scone-place-3-lrg" title="scone-place-3-lrg" /></a>
<a href='http://www.dsdconstruction.com/caravan-bases-scone-palace/scone-place-4-lrg/' title='scone-place-4-lrg'><img width="150" height="150" src="http://www.dsdconstruction.com/wp-content/uploads/scone-place-4-lrg-150x150.jpg" class="attachment-thumbnail" alt="scone-place-4-lrg" title="scone-place-4-lrg" /></a>
</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/caravan-bases-scone-palace/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Surfacing Works &#8211; New Berwickshire High School</title>
		<link>http://www.dsdconstruction.com/surfacing-works-new-berwickshire-high-school/</link>
		<comments>http://www.dsdconstruction.com/surfacing-works-new-berwickshire-high-school/#comments</comments>
		<pubDate>Fri, 11 May 2012 16:11:07 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=996</guid>
		<description><![CDATA[New Berwickshire High School, Duns, Border Region, Scotland for Border Construction Ltd. Contract period: June to December 2008 Contract Value: £333,000 Scope of Works: To carry out the external and surfacing works. Works included kerbing, block paving, installing SUDS systems, &#8230; <a href="http://www.dsdconstruction.com/surfacing-works-new-berwickshire-high-school/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/berwickshire-school-lrg.jpg" rel="lightbox[996]" title="New Berwickshire High School"><img src="http://www.dsdconstruction.com/wp-content/uploads/berwickshire-school-sml.jpg" alt="New Berwickshire High School" title="New Berwickshire High School" width="280" height="210" class="alignleft size-full wp-image-998" /></a><br />
<h2 id="projectHeading">New Berwickshire High School, Duns, Border Region, Scotland for Border Construction Ltd.</h2>
<p><strong>Contract period:</strong> June to December 2008<br />
<strong>Contract Value:</strong> £333,000<br />
<strong>Scope of Works:</strong> To carry out the external and surfacing works.<br />
Works included kerbing, block paving, installing SUDS systems, ironwork, new surfacing to footways and carriageway and interfacing with other trades and utility companies.<br />
Work completed on programme and within budget.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/surfacing-works-new-berwickshire-high-school/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Car Park and Access Road &#8211; Penrith Rangers FC</title>
		<link>http://www.dsdconstruction.com/car-park-access-road-penrith-rangers-fc/</link>
		<comments>http://www.dsdconstruction.com/car-park-access-road-penrith-rangers-fc/#comments</comments>
		<pubDate>Wed, 09 May 2012 15:56:13 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[DSD Construction Case Studies]]></category>

		<guid isPermaLink="false">http://www.dsdconstruction.com/?p=982</guid>
		<description><![CDATA[New Penrith Rangers FC Stadium Car Park &#038; Access Road for Waitings Ltd. Contract period: August to September 2008 Contract Value: £121,000 Scope of Works: Formation of new car park and access road. Works included kerbing, block paving, installing SUDS &#8230; <a href="http://www.dsdconstruction.com/car-park-access-road-penrith-rangers-fc/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.dsdconstruction.com/wp-content/uploads/penrith-rangers-lrg.jpg" rel="lightbox[982]" title="New Penrith Rangers FC Stadium Car Park &amp; Access Road for Waitings Ltd"><img src="http://www.dsdconstruction.com/wp-content/uploads/penrith-rangers-sml.jpg" alt="New Penrith Rangers FC Stadium Car Park &amp; Access Road for Waitings Ltd" title="New Penrith Rangers FC Stadium Car Park &amp; Access Road for Waitings Ltd" width="280" height="210" class="alignleft size-full wp-image-989" /></a><br />
<h2 id="projectHeading">New Penrith Rangers FC Stadium Car Park &#038; Access Road for Waitings Ltd.</h2>
<p><strong>Contract period:</strong> August to September 2008<br />
<strong>Contract Value:</strong> £121,000<br />
<strong>Scope of Works:</strong> Formation of new car park and access road.<br />
Works included kerbing, block paving, installing SUDS systems, ironwork, new surfacing to footways and carriageway and interfacing with other trades and utility companies.<br />
Work completed on programme and within budget.</p>
<!-- PHP 5.x -->]]></content:encoded>
			<wfw:commentRss>http://www.dsdconstruction.com/car-park-access-road-penrith-rangers-fc/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

