Forest Holidays – Sherwood Forest Gates
Contract Title: Sherwood Forest – Gates
Client: Forest Holidays
Overview
Sherwood Forest – Gates
Following on from the Electrical Development works we have been involved with at the brand new Sherwood Cabins, part of Forest Holidays, we have recently been involved in installation of two 3metres wooden gates, which are electrical operated. This is controlled via an electronic keypad and an induction loop installed within the road surface. DSD Electrical carried out the complete installation from the post installation all the way to the commissioning and testing of the electrical 24 volt motors.
Close liaison with the Forestry Commission was required on this job due to the road been extremely busy with customers visiting the Sherwood Pines Visitor Centre, partial road close was kept to a minimum of 1 day, but works lasted in total 3 days.






Dynapac F121-6w Paver For Sale
Dynapac F121-6w Paver For Sale. The machine is in excellent condition is has completed 4015 working hours, it has been carefully and regularly serviced and maintained. For more details please call us on 01228 594969.
£95,000
Overall length: 6.50m
Overall Width: 3.40m
Height: 3.60m
Weight: 16 Tonnes
Hopper capacity: 12 Tonnes
Screed width: 5.10m to 7.30m with extension boxes
Theoretical laying rate: 600 tonnes per hour
Cumbria Highways – Street Lights
Contract Title: Cumbria Highways – Street Lights
Client: Cumbria Highways
Contract Value : Important
Overview
Following a recent short notice call from a local contractor who was undertaking some works (Section 278 of the Highways Act 1980) on behalf of Cumbria Highways, we was requested to attend site the following morning to relocate 3 street lights which were currently in the wrong position on a recently extended footway outside the new buildings for Furness College, Barrow-in-Furness.
Having recently undertaken a major street lighting project within the area, Cumbria Highways knew DSD were capable of get the job done quickly and professionally to keep inline with the required time scales and competent in liaising closely with the utility company. We hope that this will lead to a closer relationship with Cumbria Council and Cumbria Highways.


Forest Holidays – Heat Trace Works
Contract Title: Heat Trace Works
Client: Forest Holidays
Contract Value : £28,000
Overview
DSD Electrical are extremely happy to have been awarded another contract with Forest Holidays, we are really starting to build an excellent working relationship.
Following last years extreme weather conditions, Forest Holidays experienced major issues with water supplies freezing within the log cabins on all of their site. DSD have made proposals to carry out installation to over 200 lodges throughout the UK and Scotland with Heat Trace cable which will prevent the water pipes freezing when we experience extreme weather.
Last week, we completed the installation at one of the first sites.
Myers & Bowman electric installation
Contract Title: Toyota Dealership Lillyhall
Client: Myres & Bowman
Contract Value : £20,000
Overview
Toyota Dealership, Lillyhall
Following the recently constructed extension to an existing dealership, DSD Electrical were extremely excited to be given the opportunity to get involved and undertake the electrical installation to the new Car Care unit and the extension to the existing workshop area.
Close liaison with the client was required on this project as this was still an operating business with customers coming and going all day long. Night shift had to be undertaken to keep disruption down to a minimum on this project.
All aspect of the electrical spectrum were involved, a small scope of works detailed below;
- 3 phase distribution panels
- Low bay lighting
- 3 phase machinery supplies
- 110Volt system
- External sales area lighting
- Fire Alarm system
- Emergency Lighting
- Electric Door supplies
Forest Holidays – Lodge Development
Contract Title: Sherwood Forest – Lodge Development
Client: Forest Holidays
Contract Value : £120,000
Overview
Sherwood Forest – Lodge Development
After successfully securing the contract for undertaking installation the Electrical Distribution system to supply 65 cabins, the reception building and other on site services. This week we completed the first area of the site with overall completion due for the new year.
DSD Electrical are working along multiple other trades on site to ensure compliance with the program of works.
S & B awarded six new houses
S & B Construction Services are pleased to have been awarded a prestige contract by a well known local company – Carlisle Estates for the development of 6 terraced houses based on Orfeur Street in Carlisle.
S & B will be providing most of the services required for the duration of this project over the coming months, with a focus on minimising the disruption to local home owners in a highly residential area.
We are ideally placed to provide the level of service required, with a range of skilled tradesmen, and local offices and storage to facilitate the smooth running of the works.
The 6 three bedroom properties will be approved at every stage by local planners to ensure a sympathetic and consistent finish with the local area.
Barry Scott – S & B Contracts Manager said “We are delighted with the opportunity, and are ideally placed – having extensive experience on similar contracts. As S & B has been better known throughout West Cumbria, it’s great see further benefits from our new ownership and office location on Robert Street in Carlisle”
Dobbies garden centre awarded
DSD Construction are proud to announce that we have been awarded the contract to surface the new Dobbies Garden Centre in Carlisle, for and on behalf of our client Adonis Construction.

Working for our Client Adonis Construction, Our brief is to construct the access road to the Garden Centre via a new roundabout on the A595 at Orton Grange. We will also be responsible for the surfacing of the large customer car parking area. This is a large project and will involve the laying over over 5000 tonnes of Asphalt material over the coming months. Work is due to commence on the 14th of April 2011
For more information please visit the link below to Dobbies Garden Centre.
DSD invest in latest paving technology
DSD have a new addition to their ever increasing fleet of specialist surfacing plant.
The Voegele SUPER 1803-2 is the most powerful wheeled paver in the range of VÖGELE products. At a high level of perfection, it combines features such as sturdy and reliable material handling, large pave widths up to 8m, excellent mobility and easy transfer under its own power.
“In the current financial climate, we must ensure that we are proactive in an ever changing marketplace “said Shaun Nugent, Company Director. ” This significant investment means that we are able to commit to large surfacing projects and meet our customers’ immediate needs, without relying on third party companies. It is a significant investment, but in the long term it will mean we are able to make cost savings which we can pass on to our clients in an increasingly competitive market”
The machine is available for external hire. It will appear shortly on our Plant hire section. For further details on the machine please see the below specification sheet.
Forest Holidays UK Contract
We are proud to announce that DSD Electrical division have been awarded The Periodic Test & Inspection contract for Forest Holidays UK for 2011.
Further details will be updated soon.